



Installation of Brentwood Drift Eliminators and Fill Pack
We recently completed a seamless installation of new Brentwood Drift Eliminators and Fill Pack on a Cooling Tower. The existing components were deteriorated and no longer operating effectively, making replacement essential to restore performance and improve efficiency. With the new components in place, the Cooling Tower is now running at optimal capacity, delivering improved energy efficiency and system reliability.
Installation Procedure
-
Removal of existing Drift Eliminators and Fill Pack
-
Thorough pressure wash of the Cooling Tower to remove debris and build-up
-
Inspection and adjustment of the Fill Pack support structure
-
Installation of new Brentwood Drift Eliminators and Fill Pack
-
Comprehensive quality check to ensure optimal performance
Key Benefits of Upgrading Drift Eliminators and Fill Pack
-
Improved Efficiency: Enhanced airflow and heat exchange reduce energy use and boost performance
-
Better Water Distribution: New Fill Pack improves water spread across the surface, aiding heat transfer
-
Reduced Water Loss: New Drift Eliminators minimise drift, conserving water and improving safety
-
Enhanced Performance: Restores the Cooling Tower’s full operational capacity
-
Extended System Lifespan: Fresh components reduce wear and prolong equipment life
-
Compliance & Safety: Helps meet regulatory and environmental standards
Ready to enhance your Cooling Tower’s efficiency and extend its service life?
Explore Brentwood Drift Eliminators and Fill Pack Options, or contact us today for expert advice and a tailored installation solution.